Casperimp
Vital 1st Team Regular
I went past Sincil Bank earlier and there was scaffolding being put up at the back of the the St Andrews stand.
There was a hoist taking off the Greenlinc sign on the back of the stand and a large cherry picker elevated platform with a people at the top cleaning and spraying the back of the stand all in preparation for painting I guess.
Also I went by after seeing it for a closer a look and netting has been installed under the roof as well.
There was a hoist taking off the Greenlinc sign on the back of the stand and a large cherry picker elevated platform with a people at the top cleaning and spraying the back of the stand all in preparation for painting I guess.
Also I went by after seeing it for a closer a look and netting has been installed under the roof as well.


